How to calculate the burden for a Mv current transformer?

If you’re a working professional in medium-voltage (MV) power systems—whether you’re a utility maintenance engineer, an electrical contractor, or a plant control system designer—you’ve likely run into the phrase “current transformer burden” more times than you can count. But until I started working directly with MV instrument current transformer (CT) users over the past 12 years, I didn’t fully grasp how much misinformation circulates around this critical calculation. Too often, folks treat burden like a trivial afterthought: they grab a random 1.0 ohm resistor off a shelf, plug it into the circuit, and hope for the best. Last year, a client from a Midwest power utility called me in a panic: their metering CT was delivering wildly inaccurate voltage readings, and they’d wasted three days troubleshooting wiring when the root cause was an incorrectly sized burden. That incident stuck with me, and it’s why I want to break this down clearly, step-by-step, from the perspective of someone who designs, sells, and troubleshoots these devices every single week. Mv Instrument Current Transformer

First, let’s start with the basics: what is burden, anyway? For MV instrument CTs, burden isn’t a weight or a stress—it’s the total electrical load that the CT’s secondary winding has to power. Think of the CT as a precision electric gearbox: it steps down the high current on the primary side (say, 12,000V at 100A) to a low, safe current on the secondary side (almost always 5A or 1A, per international standards). That secondary current doesn’t exist in a vacuum; it has to run through all the devices connected to it. That includes the ammeter or power meter, the wiring between the CT and the meter, and even built-in test leads or small terminal blocks. Every one of those components adds resistance to the circuit, and that total resistance is what we call burden, measured in ohms. If the burden is too high, the CT can’t deliver its rated secondary current accurately. If it’s too low, wait—no, actually, burden has a maximum rated value, not a minimum. Your CT is built to handle a specific number of ohms before its accuracy drops below the IEC or ANSI standards you rely on for billing, protection, or monitoring.

Let me pull back the curtain a little here: as an MV instrument CT supplier, we test every unit we ship to confirm its “accuracy class” at the rated burden. Our standard MV CTs, for example, have accuracy classes of 0.2S for metering (that means ±0.2% error at rated current) and 5P20 for protection (±5% error even at 20 times rated current). These ratings are only valid if the total burden in the secondary circuit is exactly the value we specify—usually between 0.5 ohms and 10 ohms, depending on the CT size. Over the years, I’ve heard customers argue that “lower burden is better” because it reduces heat, but that’s a myth. A 0.1 ohm burden would be so low that the CT’s secondary winding would see excessive current, risking insulation damage, and accuracy would tank. The sweet spot is right at the rated burden for your CT, which brings us to the first hard rule of calculation: never guess.

The calculation process might sound technical, but it’s manageable as long as you break it into three clear parts: calculate the burden of each component in the secondary circuit, add them up, and verify that the total doesn’t exceed your CT’s maximum rated burden. Let’s walk through this with a real-world example, because numbers stick way better than vague rules. Suppose you’re installing a 12kV MV CT at a 500A main distribution panel. The CT is a 5A secondary unit with a 2.5 ohm rated burden, and it will connect to a digital power meter that has a rated burden of 0.3 ohms. Now, you have to run secondary wiring from the CT to the meter—let’s say the distance is 50 feet (15 meters), and you’re using 14 AWG copper wire.

First, calculate the wiring resistance. Copper wire’s resistance is a function of its gauge, length, and temperature. At 25°C (77°F), 14 AWG copper has a resistance of 2.525 milliohms per foot (per the National Electrical Code, which we all follow for MV installations). Wait a second—important note here: when you count wiring resistance, you have to count two wires, not one. The secondary circuit is a loop: current leaves the CT’s S1 terminal, goes to the meter, and returns to the CT’s S2 terminal. So for a 50 foot run, that’s 100 total feet of wire. The wiring resistance here is 100 ft × 0.002525 ohms/ft = 0.2525 ohms. Got that? Most people forget the second wire, which is why their burden calculations are off by half.

Next, add the other components. The power meter is 0.3 ohms, as we noted. Now, what about other small parts? Terminal blocks, test switches, or any jumpers you might add to make future maintenance easier? Those are tiny, usually less than 0.05 ohms total, but we always include them to be safe. So total burden so far is: 0.2525 (wiring) + 0.3 (meter) + 0.05 (accessories) = 0.6025 ohms. Wait, that number is way lower than our CT’s 2.5 ohm rated burden, so it’s okay, right? Not so fast—let’s test a different scenario. Suppose you’re running the same CT, but the meter is 200 feet (60 meters) away, not 50. Now the wire length is 400 feet, so wiring resistance is 400 × 0.002525 = 1.01 ohms. Add the same meter and accessories: 1.01 + 0.3 + 0.05 = 1.36 ohms. That’s still under 2.5, so that works. But what if the run is 1,000 feet (300 meters)? Now wiring is 2,000 feet total, so 2,000 × 0.002525 = 5.05 ohms. Add the meter: 5.05 + 0.3 = 5.35 ohms. That’s way over our CT’s 2.5 ohm maximum, and that’s exactly where that Midwest utility client went wrong. They had a 1,200 foot wire run, used a 2.5 ohm CT, and their total burden came to 6.2 ohms—so their CT was delivering only 80% of the rated secondary current, leading to skewed meter readings. That’s a simple mistake, but one that costs time and money.

Now, let’s talk about the numbers that often trip people up: temperature and wire gauge. Earlier, I used 14 AWG, but what if the wire is thinner, like 16 AWG, which is sometimes used for secondary circuits? 16 AWG copper is 4.016 milliohms per foot at 25°C, so a 1,000 foot run would be 8.032 ohms of wiring, which would make the burden 8.032 + 0.3 = 8.33 ohms—if you have a 5 ohm rated CT, that’s over the limit, no good. And temperature matters because as copper heats up, its resistance increases. For every degree Celsius above 25°C, copper resistance increases by 0.393%. If your installation is in a 40°C (104°F) hot warehouse, that’s a 15°C difference, so resistance goes up by about 6%—small, but if you’re already right at the burden limit, that 6% push could tip you over into inaccuracy. We always recommend using 14 AWG copper for secondary runs longer than 100 feet, and 12 AWG if you go over 500 feet, to avoid those issues.

Another common question: what about protection CTs vs. metering CTs? The calculation is exactly the same, but the burden ratings differ because their accuracy requirements are different. A metering CT needs high accuracy at rated current, so its rated burden is usually lower (1.0 to 5.0 ohms) to keep its error tight. A protection CT, on the other hand, needs to handle high current surges—like during a short circuit—so its rated burden is usually higher (5.0 to 10.0 ohms). That’s because protection relays have more internal components, so their burden is higher, and the CT has to be built to handle that load without saturating. I can’t tell you how many times a contractor will try to use a metering CT for a protection application, and their burden calculation is wrong because they don’t account for the relay’s higher load. That’s a fast way to get a relay that doesn’t trip when it’s supposed to, which is a safety hazard.

Let’s also touch on standards, because this isn’t just guesswork—it’s based on global rules. The two main standards for MV instrument CTs are IEC 60044-1 (International Electrotechnical Commission) and ANSI C12.20 (American National Standards Institute). Both specify how burden is measured and what accuracy classes mean. For example, IEC 60044-1 defines burden as the total impedance of the secondary circuit, including resistance, reactance, and even the DC resistance of the CT’s secondary winding itself. Wait—yes, I almost forgot that! The CT’s own winding adds a tiny amount of resistance, usually between 0.05 and 0.2 ohms for MV CTs. Most of the time, that’s negligible, but if you’re calculating burden to the tenth of an ohm, you have to add that in. Again, that’s the kind of detail we build into every CT we test at our facility, so we can give customers accurate burden ratings they can rely on.

Now, let’s address a few myths that I’ve spent years debunking with clients. First myth: “Burden only matters for long runs.” No, it matters for every installation, even if the run is 10 feet. If your meter has a 0.5 ohm burden, and you’re using a 0.1 ohm CT, even a 10 foot run of 18 AWG wire (which is 6.385 milliohms per foot, so 0.1277 ohms total) gives a total burden of 0.5 + 0.1277 = 0.6277 ohms, which is over your CT’s 0.1 ohm maximum. That’s a common mistake with small, low-accuracy CTs, and it’s why even short installations can have accuracy issues. Second myth: “Lower accuracy class CTs don’t need burden calculations.” That’s not true either—even a 10P10 CT (±10% error) will have that error increase if burden is too high. Accuracy classes are just tolerances, not excuses to skip calculation. Third myth: “Reactance doesn’t matter for burden.” Wait, in most secondary circuits, reactance is very low compared to resistance, so you can ignore it for routine calculations. But if you have a very long run (over 1,000 feet) or use a lot of inductive components in the secondary circuit, you do have to add reactance to your total burden. Most utility engineers use impedance analyzers to measure total burden on-site, but for preliminary calculations, resistive burden is a good proxy.

So, putting it all together, here’s a step-by-step checklist you can follow for every MV CT burden calculation, no matter the application:

  1. Know your CT’s rated secondary current and maximum allowable burden. This will be printed on the CT nameplate, or you can get it from your CT supplier.
  2. Calculate the resistance of the secondary wiring: use the wire gauge, total length (2× the one-way distance between CT and device), and correct resistance per foot for your wire gauge. Don’t forget to adjust for temperature if your installation is in extreme heat or cold.
  3. Add the burden of the connected device: power meter, relay, transducer, or other equipment. This will be listed in the device’s datasheet, usually labeled as “ burden” or “input burden.”
  4. Add 0.05 ohms for small accessories (terminal blocks, test leads, jumpers) and 0.1 ohms for the CT’s own secondary winding (if you need high precision).
  5. Sum all these numbers, and confirm that the total is less than or equal to your CT’s maximum rated burden. If it’s more, you have three options: use a larger gauge wire (to reduce wiring resistance), move the connected device closer to the CT (to reduce wiring length), or specify a CT with a higher maximum burden.

I want to circle back to that Midwest utility client because that mistake led us to update our customer onboarding process. Now, when we ship an MV CT, we include a one-page guide with a sample calculation, a wire resistance chart, and a link to a free burden calculator tool we built for our clients. Most of the time, our customers don’t need to run complicated calculations because we size the CT for their application, but we still make that guide available for anyone who wants to double-check. Last quarter, a contractor in Texas used that tool, and confirmed their burden was within limits—saving them from a potential shutdown when they were installing a new solar farm’s metering system.

If you’re reading this and still feeling uncertain, that’s totally normal. Burden calculation is easy once you’ve done it a few times, but the devil is in the details: counting two wires, remembering temperature, and adding in those tiny accessory resistances. That’s why it’s worth working with an MV instrument CT supplier who not only ships quality units but also offers support for these calculations. We’ve been doing this for over a decade, so we’ve seen every mistake in the book—from forgotten wire runs to misread nameplates—and we can help you avoid those pitfalls.

Whether you’re sizing a CT for a new industrial plant, upgrading a utility’s metering system, or troubleshooting an inaccurate reading that’s costing your company thousands in billing errors, getting the burden right is non-negotiable. It’s not a technicality, it’s the foundation of your CT’s accuracy. Don’t rely on guesswork, don’t use old calculations from a past job, and don’t hesitate to reach out if you need a second pair of eyes.

If you’re preparing for an upcoming MV CT installation, or you’ve run into a burden issue and need help troubleshooting, don’t hesitate to contact our team to discuss your project. We’re happy to share our expertise, provide a tailored burden calculation for your specific setup, and help you select the right MV current transformer for your needs.

MV Instrument Voltage Transformer References:

  1. International Electrotechnical Commission. IEC 60044-1: Instrument Transformers – Part 1: Current Transformers. Geneva: IEC, 2018.
  2. American National Standards Institute. ANSI C12.20: Electric Metering Equipment – Part 2: Accuracy Requirements. New York: ANSI, 2019.
  3. National Fire Protection Association. NEC 2020: Chapter 3 – Wiring Methods and Materials. Quincy: NFPA, 2020.

Dalian Xin’anyue Electric Power Equipment Co., Ltd.
Dalian Xin’anyue Electric Power Equipment Co., Ltd. is one of the most reliable mv instrument current transformer manufacturers and suppliers in China, featured by quality products and good price. Please rest assured to wholesale durable mv instrument current transformer in stock here from our factory. We also accept customized orders.
Address: No.99, Group 1, Chongwangmiao Community, Taiping Street, Pulandian District, Dalian City, Liaoning Province, China
E-mail: sales@dlxay.com
WebSite: https://www.xayelectric.com/